(Solved) : Write The Apt Part Program To Perform The Drilling Operations . . .

Write the APT part program to perform the drilling operations for the part. Use the TURRET command to call the different drills required. Cutting speed = 0.4 m/s, feed = 0.10 mm/rev., and table travel speed between holes = 500 mm/min. Postprocessor call statement is MACHIN/TURDRL, 02.

Expert Answer

Attached

Posted in Uncategorized